What Should Builders Include in an Aluminum Window RFQ

What Should Builders Include in an Aluminum Window RFQ

Consider a supplier quotation for what looks like a standard aluminum window. The quotation may include insect screens on all openings, or only on certain elevations. Items such as glass buildup, hardware, and export packing must also be compared for cost. The lowest price quote is not necessarily the lowest cost for your project until all of these items and their related assumptions have been written down.

Give Every Opening a Clear Identity

Each opening should be clearly identified on plans, elevations, schedules, quotations, and packing labels. This includes location, quantity, width, height, opening type and handing, and reference to the related drawing revision. Fixed lights adjacent to sliders must also be individually referenced on the schedule if the glass or hardware is different.

Drawings and Dimensions

The supplier will need dimensioned elevations, sections through wall/sill details, rough opening sizes, and completed floor levels for each mark. Quantity, operation, handing, and drawing revision for each mark should be clearly detailed. Note any site measurements still outstanding, give a contact person, and state when they will be confirmed. List out the fixed lights, opening sashes, screens, side lights, transoms, and doors within the schedule and state the specific requirements for each item, such as hardware, glazing, fabrication, and packaging. A kitchen window above a stone worktop requires the finished sill level to clear the work surface. Suppliers need to be aware of large items and restricted access to sites to price and deliver for transport and installation.

Set Out Performance and Regulatory Requirements

Using terms like “high performance” or “coastal grade” will not get a supplier to quote a correct price. Outline the country, building type, site exposure, and relevant building code, and then assign each requirement to the relevant openings. Outline the wind classification/design input, the water and air performance, the desired thermal performance, and any acoustic or safety performance required. Specify if each requirement is for the complete window, a specific size, or for a particular elevation. That way the supplier is pricing against the same brief and cannot make wrong assumptions.

Glass and Safety Requirements

“Double glazing” is not a complete glass specification. You should specify the build-up, safety-glass requirements, coatings, tints, spacers, and obscurity level. In addition to this, you should also reference the relevant local glazing regulations for that area. Low-level glazing, bathroom windows, and doors below steps or on sloping sites are often best specified separately from the standard living-room window. Where acoustic performance is critical, provide evidence of the proposed assembly to rely on rather than assume that thicker glass alone will provide the necessary acoustic performance. Specify any cost-reduced alternatives as separate options to enable comparison with the original design specification.

aluminum windows

Describe the Window System Being Quoted

The profile, sightline, finish, and opening function should all belong to one compatible series. A quote that combines a frame detail from one model with glass or hardware assumptions from another is difficult to verify and may not describe a product that can be supplied as specified.

Frame, Finish, and Drainage

Refer to a specific series within the RFQ if chosen; otherwise, specify the profile depth, thermal break, visible face width, sash open direction, interior and exterior finishes, screen, sill, and drainage details. Reference to the T6 integrated screen and sash window design with outward-opening action should be confined to that single product and details incorporated into the spec as appropriate, as opposed to applying as a spec to all other window designs within a family. The frame-to-wall detail is as important as the product itself, and unresolved sill detail and poor flashing or drainage details can cause problems post-delivery, particularly to exposed elevations or with unusual building detail. Request an installation plan to show how the frame relates to the surrounding building detail.

Hardware and Operation

List hardware separately: handle position and finish, locking points, restrictors, hinges or rollers, screen operation, accessibility requirements, and any preferred standard. Heavy or oversized sashes need a review against the proposed glass weight. A handle photograph alone says little about the operating and locking arrangement.

Define Delivery and Commercial Terms

It’s important to distinguish between the unit price and the total purchase price. Be sure to include the delivery address, trade terms and conditions, stock release sequence, and required documents in the quotation. Note also that the manufacturing lead time and the shipping time must be clearly distinguished. For imported goods the cost of customs clearance, unloading, and temporary storage at the customer premises may be charged by a third party. Make sure all costs and corresponding responsibilities are clearly listed in the quotation. Inspections, labeling of crates, and additional protection must also be included in the total price of the quotation.

Quantities, Packaging, and Labels

For each opening, show the following: opening mark, delivery phase, destination, and site or container limits. Packing Method and Glass/Coated Finish Protection. Label Format. Ensure that crates can be traced back to the opening schedule in case of a shortage or damaged unit. The S110 system window serves as a reminder of the approved configuration for packing a unit: screen, sash, and hardware versus a fixed frame and required protection.

For imported goods it is important to clarify who is responsible for the inspection of the goods upon delivery and how to record any possible damages or missing items. It is advisable to refer to photos of the crate, labels, and affected items in order to clearly link any possible claim with the corresponding delivery, even when deliveries arrive in several batches or contain similar-sized window items.

Sample Approval and Change Control

Make sure the sample used for approval is the one that governs production. For example, a color swatch is a finish sample, a corner sample shows a joint or coating, and an operating mock-up is best for showing an unusual sill, screen, or opening action. Record who approved what sample and what drawing revision that sample was for. After production has started, list any changes to glass, hardware, finish, or opening direction as formal variations record the cost and schedule impact, and have the factory approve it before implementation.

brightly lit villa

Compare Quotes on the Same Basis

Compare inclusions, exclusions, pending items, and evidence provided. A unit price can contain a missing screen, changed glass, unpriced hardware, or reduced packing. Compare bids against the same schedule.

Questions Before Award

Before the award check series, glass, finish, hardware, evidence of test, drawings, samples, delivery, packing, spares, warranty, and installation support. Is the Micro ventilation option from EDUN relevant? Please state which options will be supplied with the order.

A clear RFQ is as important on a one-off villa project as it is on a repeated apartment program. It helps the site teams understand what is required when several trades are involved.

List unresolved inputs beside the price: floor level, wall build-up, wind data, site measurements, and color approval. Name who will confirm each item and by when.

Price out the alternatives for triple glazing, integrated screens, different finishes, and up-rated hardware as separate items prior to award to ensure that all premium elements are visible before shop drawings are released rather than after.

Share current drawings, opening schedule, approved samples, inclusions, and change log prior to production start. Do not rely on subsequent emails as formal approval—record formally.

FAQ

Q1: What is the first attachment for an aluminum window RFQ?

A1: Attach the current opening schedule with dimensioned drawings. Each mark should show location, size, quantity, opening type, and handing, with the drawing revision visible. Add sections wherever wall construction or sill details affect the frame.

Q2: Should an RFQ request a U-value?

A2: Yes. Specify the performance required and the relevant unit. Clarify whether performance is required for the complete window or only for the glass. Specify the size, configuration, and compliance issue of interest.

Q3: Why include packaging in a quotation checklist?

A3: The packaging of a part can cause damage as well as make identification harder. Specify adequate protection, adequate labeling, a delivery sequence, and who is responsible to report damage or short delivery parts—especially in case of split deliveries.